Q3041NTS / FPSC / PPSC
At low value of power factor, the cost of generation of a power station will be____________?
Q3042NTS / FPSC / PPSC
Compounding of steam turbine is done for_______________?
Q3043NTS / FPSC / PPSC
The value of the reheat factor is of the order of_____________?
Q3046NTS / FPSC / PPSC
Blowing down of boiler water is the process_____________?
Q3047NTS / FPSC / PPSC
TravelUng grate stoker can burn coals at the rates of____________?
Q3048NTS / FPSC / PPSC
Where unpulverised coal has to be used and boiler capacity is large, the stoker which is used is______________?
Q3049NTS / FPSC / PPSC
Example of overfeed type stoker is___________?
Q3050NTS / FPSC / PPSC
Under-feed stokers work best for _________ coals high in volatile matter and with caking tendency?
Q3051NTS / FPSC / PPSC
In _________ system fuel from a central pulverizing unit is delivered to a bunker and then to the various burners?
Q3052NTS / FPSC / PPSC
The amount of air which is supplied for complete combustion is called___________?
Q3054NTS / FPSC / PPSC
Method which is commonly applied for unloading the coal for small power plant is___________?
Q3055NTS / FPSC / PPSC
Load carrying capacity of belt conveyor is about___________?
Q3056NTS / FPSC / PPSC
In coal preparation plant, magnetic separators are used to remove___________?
Q3057NTS / FPSC / PPSC
Secondary air is the air used to______________?
Q3058NTS / FPSC / PPSC