Q1641NTS / FPSC / PPSC
What all has to be identified as per risk identification ?
Q1642NTS / FPSC / PPSC
Which one is not a size measure for software product ?
Q1643NTS / FPSC / PPSC
Estimation of size for a project is dependent on___________________?
Q1645NTS / FPSC / PPSC
Which model assumes that systems are created from reusable components, scripting or database programming ?
Q1646NTS / FPSC / PPSC
Which model is used during early stages of the system design after the requirements have been established ?
Q1647NTS / FPSC / PPSC
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
Q1648NTS / FPSC / PPSC
Which of the following states that work expands to fill the time available ?
Q1649NTS / FPSC / PPSC
Which technique is applicable when other projects in the same analogy application domain have been completed ?
Q1650NTS / FPSC / PPSC
Which of the following costs is not part of the total effort cost ?
Q1651NTS / FPSC / PPSC
A _______________ is developed using historical cost information that relates some software metric to the project cost ?
Q1652NTS / FPSC / PPSC
A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?
Q1654NTS / FPSC / PPSC
The environment that supports the software project is called_______________________?
Q1655NTS / FPSC / PPSC
What is related to the overall functionality of the delivered software ?
Q1656NTS / FPSC / PPSC
Which of the following is not achieved by an automated estimation tools ?
Q1657NTS / FPSC / PPSC
Which of the following are parameters involved in computing the total cost of a software development project ?
Q1658NTS / FPSC / PPSC
What can be used to complement decomposition techniques and offer a potentially valuable estimation approach in their own right ?
Q1659NTS / FPSC / PPSC