Relevant Competitive Tests:
carrying a uniformly distributed load per metre length is suspended at two A pile of length points, the maximum, B.M. at the centre of the pile or at the points of suspension, is_________________?
A. WL/8
B. WL²/24
C. WL²/47Correct Answer
D. WL²/16
Correct Option: C. WL²/47
This question has been verified by the PakPrep community moderation network for competitive examination accuracy.
Subject Overview
Explore thousands of solved past paper MCQs for Civil Engineering Mcqs categorized with explanations.
Browse All Civil Engineering Mcqs MCQs →