If the difference between costs linked to highest and lowest observation of cost driver, is $8000 and observation of cost driver is 40 machine hours, then slope coefficient will be _____________?

A. $16,000
B. $200Correct Answer
C. $400
D. $20,000
Correct Option: B. $200