In an electric kettle water boils in 10 m minutes. It is required to boil the boiler in 15 minutes, using same supply mains______________?
A. length of heating element should be decreasedCorrect Answer
B. length of heating element should be increased
C. length of heating element has no effect on heating if water
D. none of the above
Correct Option: A. length of heating element should be decreased