Rate of flow of sewage is generally assumed__________________?

A. More than the rate of water supply
B. Equal to the rate of water supply
C. Less than the rate of water supply
D. At 150 litres per capitaCorrect Answer
Correct Option: D. At 150 litres per capita

This question has been verified by the PakPrep community moderation network for competitive examination accuracy.

HomeCategoriesQuizSaved (0)Profile