The Tarbela catchment erosion has been measured at the rate of _____ meter:

A. 2 to 4 kg/sqCorrect Answer
B. 3 to 5 kg/sq
C. 4 to 6 kg/sq
D. None of these
Correct Option: A. 2 to 4 kg/sq

This question has been verified by the PakPrep community moderation network for competitive examination accuracy.

HomeCategoriesQuizSaved (0)Profile