Showing 2301 – 2320 of 3,699 verified multiple choice questions with answers and explanations.
Q2301NTS / FPSC / PPSC
___________ is invariably used as base load plant.
Q2303NTS / FPSC / PPSC
Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
Q2304NTS / FPSC / PPSC
Salvage value of the plant is always____________?
Q2305NTS / FPSC / PPSC
Which of the following equipment provides fluctuating load?
Q2307NTS / FPSC / PPSC
A nuclear power plant is invariably used as a__________?
Q2309NTS / FPSC / PPSC
Which of the following should be used for extinguishing electrical fires?
Q2310NTS / FPSC / PPSC
Direct conversion of heat into electric power is possible through__________?
Q2311NTS / FPSC / PPSC
Annual instalment towards depreciation reduces as rate of interest increases with______________?
Q2312NTS / FPSC / PPSC
Annual operating expenditure of a power plant consists of____________?
Q2313NTS / FPSC / PPSC
Power plant having maximum demand more than the installed rated capacity will have utilization factor?
Q2315NTS / FPSC / PPSC
Different generating stations use following prime movers?
Q2316NTS / FPSC / PPSC
In Hopkinson demand rate or two part tariff the demand rate or fixed charges are__________?
Q2317NTS / FPSC / PPSC
Annual depreciation as per straight line method, is calculated by__________?
Q2319NTS / FPSC / PPSC
Depreciation charges are high in case of__________?
Q2320NTS / FPSC / PPSC