Q2321NTS / FPSC / PPSC
Approximate estimation of power demand can be made by_____________?
Q2322NTS / FPSC / PPSC
Maximum demand on a power plant is_________________?
Q2323NTS / FPSC / PPSC
For high value of diversity factor, a power station of given installed capacity will be in a position to supply?
Q2324NTS / FPSC / PPSC
_____________can generate power at unpredictable or uncontrolled times?
Q2325NTS / FPSC / PPSC
Which of the following is not a source of power?
Q2327NTS / FPSC / PPSC
Air will not be the working substance in which of the following?
Q2328NTS / FPSC / PPSC
Which of the following, in a thermal power plant, is not a fixed cost?
Q2329NTS / FPSC / PPSC
In _________ fuel transportation cost is least.
Q2330NTS / FPSC / PPSC
With reference to a power station which of the following is not a fixed cost?
Q2331NTS / FPSC / PPSC
In which’of the following power plants the maintenance cost is usually high?
Q2332NTS / FPSC / PPSC
Which of the following is not an operating cost?
Q2333NTS / FPSC / PPSC
The connected load of a IVMIM uir consumer is around___________?
Q2334NTS / FPSC / PPSC
Which of the following is an advantage of static capacitor for power factor improvement?
Q2335NTS / FPSC / PPSC
An alternator coupled to a __________ runs at slow speed, as compared to as compared to others.
Q2336NTS / FPSC / PPSC
When the demand of consumers is not met by a power plant, it will resort to which of the following?
Q2337NTS / FPSC / PPSC
In power plants insurance cover is provided for which of the following?
Q2338NTS / FPSC / PPSC
Which of the following are not repayable after a stipulated period?
Q2339NTS / FPSC / PPSC